Design a Model to Assess the Implementation of Six Sigma in Aystavyn Co.

Document Type : Original Article

Authors

1 Associate Professor, Shiraz University.

2 Assistant Professor, Shiraz University.

3 MA Student, Shiraz University.

Abstract

In recent years, a growing desire has emerged to use Six Sigma techniques. Six Sigma can win companies to improve quality and reduce expenses in today's competitive world. But the important thing is that this tool should be used in organizations that are prepared; unprepartion for Six Sigma implementation leads to frustration among staff at different organizational levels and finally creates resistance and opposition against the project. The aim of this research is to assess the readiness of companies to provide Six Sigma implementation. For this purpose, first readiness indicators were identified for the implementation of Six Sigma, then to determine the relationship between these indicators interpretative structural modeling was applied. Finnaly through ANP weight of indictors were determined.The results showed that the "leadership and vision", "right choice" and "management improvement process" are more important.

Keywords


1. Antony, J. (2014). Readiness factors for the Lean Six Sigma journey in the higher education sector. International Journal of Productivity and PerformanceManagement63(2), 257-264.‏
2. Atefi, M. (2007).Six Sigma and Lean Services, Tehran, Iran. Author.  
3. Azar, A. and faraji, H. (2010). Fuzzy Manageement Science.  Mehranan-e-nashr, Tehran
4. Azar,A., Mirfakhredini,H., anvarirostami,A.(2008) Comparison of data analysis in Six Sigma, with the help of statistical tools and techniques Multiple Attribute Decision Making. Journal of Management Studies in Iran. 12(4), 1-35 
5. Biedry, J. (2001). Column: Site Visit: Linking Six Sigma Analysis with Human Creativity. Journal for Quality and Participation, 24(4).
6. Brun, A. (2011). Critical success factors of Six Sigma implementations in Italian companies. International Journal of Production Education, 131(1), 158-164.
7. Byrne, G. Lubowe, D. & Blitz, A. (2007). Using a Lean Six Sigma approach to drive innovation. Strategy & Leadership, 35(2), 5-10.
8. Chen, M., & Lyu, J. (2009). A Lean Six-Sigma approach to touch panel quality improvement. Production Planning and Control, 20(5), 445-454.
9. Cheng, J. H. Lee, Ch. M and Tang, Ch. H (2009), An Application of Fuzzy Delphi and Fuzzy AHP on Evaluating Wafer Supplier in Semiconductor Industry, WSEAS Transactions on Information Science and Applications, 6, 756-767.
10. El Haouzi, H., Petin, J. F., & Thomas, A. (2009). Design and validation of a product-driven control system based on a six sigma methodology and discrete event simulation. Production Planning and Control, 20(6), 510-524.
11. Firozian,A., Firozian,M., Hashemipetrodi, H. and Gholamreza zadeh, F. (2013) Application techniques Interpretive Structural Modeling (ISM) in Tourism Studies (analytical pathological), Tourism Planning and Development Journal2(6), 129-159
12. Flynn, S. W. (2011). Determining Critical Factors of Six-Sigma Initiatives: A Study of the American Society For quality region. Master Thesis, Industrial Management, March.
13. Foster, S. T. (2007). Does Six Sigma improve performance?. Quality Management Journal, 14(4), 7.
14. Habidin, N. F., & Yusof, S. R. M. (2013). Critical success factors of Lean Six Sigma for the Malaysian automotive industry. International Journal of Lean Six Sigma, 4(1), 60-82.
15. Henderson, K. M., & Evans, J. R. (2000). Successful implementation of Six Sigma: benchmarking general electric company. Benchmarking: An International Journal, 7(4), 260-282.
16. Ismyrlis, V., & Moschidis, O. (2013). Six Sigma's critical success factors and toolbox. International Journal of Lean Six Sigma, 4, 108 - 117 -
17. Kazazi, A. and Sarokhani, D. (2005).Identify key factors in the effective application of Six Sigma programs in different organizations (large multinational organizations, SMEs, services). Third International Conference on Management. 
18. Khobyari, B. (2003). Six Sigma and its role in improving the efficiency and effectiveness of the organization's processes. Organiaztional Development50, 20-27.
19. Krueger, D. C., Parast, M. M., & Adams, S. (2013). Six Sigma implementation: a qualitative case study using grounded theory. Production Planning & Control, (ahead-of-print), 1-17.
20. Lagrosen, Y., Chebl, R., & Tuesta, M. R. (2011). Organisational learning and Six Sigma deployment readiness evaluation: a case study. International Journal of Lean Six Sigma2(1), 23-40.
21. Laureani, A., & Antony, J. (2012). Critical success factors for the effective implementation of Lean Sigma: Results from an empirical study and agenda for future research. International Journal of Lean Six Sigma, 3(4), 274 – 283.
22. Lee, T. Y., Wong, W. K., & Yeung, K. W. (2011). Developing a readiness self-assessment model (RSM) for Six Sigma for China enterprises. International Journal of Quality & Reliability Management28(2), 169-194.
23. Nikdel, A., Rabbani, M., Manavizadeh,N and Fatemi,M.(2006). Using Six Sigma approach in the petrochemical industry.  The first international conference on Six Sigma.
24. Nikfarajam, R., Norolsana, R. (2009). Identify key factors in the implementation of Six Sigma projects in Sarcheshmeh Copper Complex. Seventh International Conference on Management
25. Research Center for Ports and Shipping Organization. (2007). Using Lean Six Sigma concepts martyr Rajai Port container terminal. Tehran-Iran, Ports and Shipping Organization
26. Salehisadaghiani, J. and rostayi, A. (2005).Six Sigma position in customer satisfaction.  Journal of Accountant, 20(168), 26-29
27. Sepahvand, R., Arefnejad, M. and toghraee, M. (2012).Analysis of factors affecting successful implementation of Lean Six Sigma in order to produce world-class (the mining industry, household appliances), Journal of Industrial Management Faculty of Human Sciences, Islamic Azad University of Sanandaj, 7(21), 71-72 
28. Snee, R. D. (2000). Impact of Six Sigma on quality engineering. Quality Engineering, 12(3), 9-14.
29. Sodhi, M. S., & Sodhi, N. S. (2005). Six sigma pricing. Harvard business review, 83(5), 135-142.
30. Taner, M. T. (2013). Critical Success Factors for Six Sigma Implementation in Large-scale Turkish Construction Companies. International Review of Management and Marketing, 3(4), 212-225.
31. Tjahjono, B., Ball, P., Vitanov, V. I., Scorzafave, C., Nogueira, J., Calleja, J., ... & Yadav, A. (2010). Six Sigma: a literature review. International Journal of Lean Six Sigma, 1(3), 216-233.‏
32. Wang, L., & Hussain, I. (2011). Banking Sector Growth in China: Can Six-Sigma Be a Solution? International Journal of Business and Management, 6(2), February.
33. Weinstein, L., Castellano, J., Petrick, J., & Vokurka, R. (2011). The Evolution of Six-Sigma, Lean Sigma and Fit Sigma TM. Journal of Education for Business, pp. 19:54,
34. Zegerdi,H., Bagheri, S. and Attarian, J. (2010). Statistical analysis of the relationship between key elements of Six Sigma projects in companies in Iran. Journal of Industrial Engineering, 44(1), 49-62.