1. Abdelkader, Y. H. (2004). Evaluating project completion times when activity times are Weibull distributed. European journal of operational research, 157(3), 704–715.
2. Adlakha, V. G., & Kulkarni, V. G. (1989). A classified bibliography of research on stochastic PERT networks: 1966-1987. INFOR: information systems and operational research, 27(3), 272–296.
3. Aliyu, A. M. (2012). Project management using critical path method (CPM): a pragmatic study. Global journal of pure and applied sciences, 18(3–4), 197–206.
4. Andiyan, A., Putra, R. M., Rembulan, G. D., & Tannady, H. (2021). Construction project evaluation using cpm-crashing, cpm-pert and ccpm for minimize project delays. Journal of physics: conference series (Vol. 1933, p. 12096). IOP Publishing.
5. Azaron, A., & Ghomi, S. M. T. F. (2008). Lower bound for the mean project completion time in dynamic PERT networks. European journal of operational research, 186(1), 120–127.
6. Azaron, A., & Tavakkoli-Moghaddam, R. (2007). Multi-objective time–cost trade-off in dynamic PERT networks using an interactive approach. European journal of operational research, 180(3), 1186–1200.
7. Azaron, A., Fynes, B., & Modarres, M. (2011). Due date assignment in repetitive projects. International journal of production economics, 129(1), 79–85.
8. Azaron, A., Kianfar, F. (2001). An algorithm for selecting the shortest path in queueing networks in steady state. Technical Faculty Journal, 35(2). (In Persian) https://ideas.repec.org/a/eee/ejores/v144y2003i1p138-156.
9. Bayani Majd, A., Noori, S., Yaghoubi, S., & Mohamadi, A. (2017). A Mathematic Model for Green Supply Chain of Project Construction considering Project Scheduling. Journal of Industrial Management Perspective, 6(4), 123-156. (In Persian)
10. Bordley, R. F., Keisler, J. M., & Logan, T. M. (2019). Managing projects with uncertain deadlines. European journal of operational research, 274(1), 291–302.
11. Charnes, A., Cooper, W. W., & Thompson, G. L. (1964). Critical path analyses via chance constrained and stochastic programming. Operations research, 12(3), 460–470.
12. Chen, W. (2022). Reliability optimization analysis of enterprise financial management system using the markov model. Mobile information systems, 2022(1), 4829902.
13. Clough, R. H., Sears, G. A., & Sears, S. K. (2000). Construction project management. John Wiley & Sons.
14. Eisner, H. (1962). A generalized network approach to the planning and scheduling of a research project. Operations research, 10(1), 115–125.
15. Esquível, M. L., & Krasii, N. P. (2025). Statistics for Continuous Time Markov Chains, a Short Review. Axioms, 14(4), 283.
16. Ferdosi, J. A., & Yaghoubi, S. (2020). Providing a Mathematical Model for Periodic Projects Evaluation and Rewarding in Matrix Organizations (Case Study: Iran Argham Corporation), Journal of Industrial Management Perspective, 10 (137), 65-88. (In Persian)
17. Flyvbjerg, B. (2021). Top ten behavioral biases in project management: An overview. Project management journal, 52(6), 531–546.
18. Gurtu, A., & Johny, J. (2021). Supply chain risk management: Literature review. Risks, 9(1), 16.
19. Herroelen, W., & Leus, R. (2005). Project scheduling under uncertainty: Survey and research potentials. European journal of operational research, 165(2), 289–306.
20. Hosseinian, S. M., Arjomand, A., Li, C. Q., & Zhang, G. (2022). Developing a model for assessing project completion time reliability during construction using time-dependent reliability theory. Journal of construction engineering and management, 148(4), 4022006.
21. Hussain, A., & Hussain, I. (2023). Modeling and multi-objective optimization of time, greenhouse gas emissions, and resources for sustainable construction projects. Sustainable production and consumption, 39, 269–284.
22. Khademvatani, A., Shokouhi, M. R., & Naami, F. (2024). Comprehensive Risk Identification and Prioritization for Engineering, Procurement, and Construction (EPC) Projects: A Case of Karoon Oil and Gas Exploitation Company. Journal of Industrial Management Perspective, 14(4), 257-292. (In Persian)
23. Kleinrock, L. (1976). Computer applications. Queueing systems, (3).
24. Lenfle, S. (2008). Exploration and project management. International journal of project management, 26(5), 469–478.
25. Ludwig, A., Möhring, R. H., & Stork, F. (2001). A computational study on bounding the makespan distribution in stochastic project networks. Annals of operations research, 102, 49–64.
26. Martin, J. J. (1965). Distribution of the time through a directed, acyclic network. Operations research, 13(1), 46–66.
27. Mostafa, K., Ojulari, S., & Hegazy, T. (2022). Enhanced repetitive scheduling formulation for meeting deadlines and resource constraints in linear and scattered projects. Canadian journal of civil engineering, 50(3), 172–183.
28. Mubarak, S. A. (2015). Construction project scheduling and control. John Wiley & Sons.
29. Müller, R., Locatelli, G., Holzmann, V., Nilsson, M., & Sagay, T. (2024). Artificial intelligence and project management: Empirical overview, state of the art, and guidelines for future research. Project management journal, 55(1), 9–15.
30. Pang, N., Jia, P., Liu, P., Yin, F., Zhou, L., Wang, L., … Wang, X. (2020). A fuzzy Markov model for risk and reliability prediction of engineering systems: a case study of a subsea wellhead connector. Applied sciences, 10(19), 6902.
31. Peiravi, A., Ardakan, M. A., & Zio, E. (2020). A new Markov-based model for reliability optimization problems with mixed redundancy strategy. Reliability engineering & system safety, 201, 106987.
32. Pryke, S., & Smyth, H. (2012). The management of complex projects: a relationship approach. John Wiley & Sons.
33. Rajeevan, A. K., Shouri, P. V, & Nair, U. (2018). Markov modeling and reliability allocation in wind turbine for availability enhancement. Life cycle reliability and safety engineering, 7, 147–157.
34. Sánchez-Herguedas, A., Mena-Nieto, A., Crespo-Márquez, A., & Rodrigo-Muñoz, F. (2024). Finite time preventive maintenance optimization by using a Semi-Markov process with a degraded state. A case study for diesel engines in mining. Computers & industrial engineering, 190, 110083.
35. Teymouri, E., & Mousavi, F. S. (2011). A genetic algorithm for inventory planning model in project supply chain. Industrial Engineering Journal, 45(1), 45-58. (In Persian) https://sid.ir/paper/166395/fa.
36. Turner, J. R., & Simister, S. J. (2001). Project contract management and a theory of organization. International journal of project management, 19(8), 457–464.
37. Yaghoubi, S., Noori, S., Azaron, A., & Tavakkoli-Moghaddam, R. (2011). Resource allocation in dynamic PERT networks with finite capacity. European Journal of Operational Research, 215(3), 670-678.
38. Yaghoubi, S., Noori, S., Azaron, A., & Fynes, B. (2015). Resource allocation in multi-class dynamic PERT networks with finite capacity. European journal of operational research, 247(3), 879–894.
39. Yamamoto, K., & Chen, L. (2024). Integrating fuzzy logic and Markov chains for resilient project scheduling. International Journal of Project Systems and Engineering, 22(3), 145–162.
40. Ye, Y., Grossmann, I. E., Pinto, J. M., & Ramaswamy, S. (2019). Modeling for reliability optimization of system design and maintenance based on Markov chain theory. Computers & chemical engineering, 124, 381–404.